* Return max spatial layer from selectors.
With differing requirements of SVC and allowing overshoot in Simulcast,
selectors are best placed to indicate what is the max spatial layer when
they indicate a switch to max spatial layer.
* fix test
* prevent race
It is possible that publisher paces the media.
So, RTCP sender report from publisher could be ahead of
what is being fowarded by a good amount (have seen up to 2 seconds
ahead). Using the forwarded time stamp for RTCP sender report
in the down stream leads to jumps back and forth in the down track
RTCP sender report.
So, look at the publisher's RTCP sender report to check for it being
ahead and use the publisher rate as a guide.
Two things
- Somehow the publisher RTCP sender report time stamp goes back some
times. Log it differently. Also, use signed type for logging so
that negative is easy to see.
- On down track, because of silence frame injection on mute, the RTCP
sender report time stamp might be ahead of timestamp we will use
on unmute. If so, ensure that next timestamp is also not before
what was sent in RTCP sender report.
* Handle time stamp increment across mute.
Two cases handled
1. Starting on mute could inject blank frame/padding packets.
These time stamps are randomly generated. So, when the publisher
unmutes, the time stamp was jumping ahead by only 1. Make it so
that they jump ahead by elapsed time since starting the blank frames/
padding packets.
2. When generating blank frames at the end of a down track, if
the track was muted at that time, the blank frame time stamps
could have been off (i. e. would have been pointing to time
after the last forwarded frame). Here also use current time
to adjust time stamp. Maybe, this could help in some cases where
we are seeing unflushed video buffer?
* remove unnecessary check
* address feedback and also maintain first synthesized time stamp
* Experimental flag to try time stamp adjustment to control drift.
There is a config to enable this.
Using a PID controller to try and keep the sample rate at expected
value. Need to be seen if this works well. Adjustment are limited
to 25 ms max at a time to ensure there are no large jumps.
And it is applied when doing RTCP sender report which happens
once in 5 seconds currently for both audio and video tracks.
A nice introduction to PID controllers - https://alphaville.github.io/qub/pid-101/#/
Implementation borrowed from - https://github.com/pms67/PID
A few things TODO
1. PID controller tuning is a process. Have picked values from test from
that implementation above. May not be the best. Need to try.
2. Can potentially run this more often. Rather than running it only when
running RTCP sender report (which is once in 5 seconds now), can
potentially run it every second and limit the amount of change to
something like 10 ms max.
* remove unused variable
* debug log a bit more
* Keep track of expected RTP time stamp and control drift.
- Use monotonic clock in RTCP Sender Report and packet times
- Keep the time stamp close to expected time stamp on layer/SSRC
switches
* clean up
* fix test compile
* more test compile failures
* anticipatory clean up
* further clean up
* add received sender report logging
* Keep track of expected RTP time stamp and control drift.
- Use monotonic clock in RTCP Sender Report and packet times
- Keep the time stamp close to expected time stamp on layer/SSRC
switches
* clean up
* fix test compile
* more test compile failures
When current became unavailable, it was possible for
target to be set to opportunistic. Because of that,
the downgrade did not happen and PLI layer lock was
requested continuously.
* Do not let request layer overshoot available.
After a layer stopped on publisher side, an optimal allocation side
while initially adjusted to not request the stopped layer, a subsequent
allocation went back to the higher layer although it was stopped.
Prevent that.
* simplify
* Use bandwidth requested from last allocation.
With overshoot/opportunistic forwarding, It is possible that
bitrate at target layers is 0. So, use bandwidth requested
from last allocation which shouold have a correct value.
Still need to think about using the latest bit rates to get
the requested bandwidth. It is possible that bitrates have
changed since last allocation. That was the idea behind using
the latest bitrates, but it could return 0. Accounting for it
runs into a few scenarios. Last allocation has number from
last allocation and is a good indicator of the need.
* race
A few more candidates to think about demoting
- Publisher mute changes
- Forwarder -> layer lock/upgrade/downgrade/overshoot adjusting
- StreamAllocator
A few things
1. Have to use expected layer in upstream distance to desired. Using
min(published, expected) means if expected is higher than published, it was not caught as a missed layer.
2. Forgot to remove layer transition update in one place. It was still constrained to screen share.
This caused quality to not pick up after constraint is released.
3. Switching to max layer cannot be marked on max published. Same as point #1 above. Otherwise,
dynacast would kick in and turn off highest layer.
There are cases where the layer bit rate configuration is such that
the expected bitrate difference is very high. For example,
setting up layer 2 (f) layer for 1.7 Mbps and layer 1 (h) for 180 kbps.
With bitrate based quality, a layer drop results in going to `POOR`
quality rating. With layer based, it will drop one level only.
Also, cleaning up the distance to desired calculation a bit.
* Expected vs actual Layer based connection quality.
With VBR streams (like screen share), bit rate is not a good indicator
of whether desired layer (spatial/temporal) is achieved due to high
variance.
Using expected vs actual layer (i. e. distance to desired) can capture
any short fall and include it in quality scoring.
This PR uses distance to desired, i. e. how many steps it would take to
go from actual spatial/temporal -> desired spatial/temporal and that
distance is propotionally used (currently it is just linear) to decrease
score.
* wire up layer transitions for screen share tracks
* Make connection quality not too optimistic.
With score normalization, the quality indicator showed good
under conditions which should have normally showed some badness.
So, a few things in this PR
- Do not normalize scores
- Pick the weakest link as the representative score (moving away from
averaging)
- For down track direction, when reporting delta stats, take the number
of packets sent actually. If there are holes in the feed (upstream
packet loss), down tracks should not be penalised for that loss.
State of things in connection quality feature
- Audio uses rtcscore-go (with a change to accommodate RED codec). This
follows the E-model.
- Camera uses rtcscore-go. No change here. NOTE: THe rtscore here is
purely based on bits per pixel per frame (bpf). This has the following
existing issues (no change, these were already there)
o Does not take packet loss, jitter, rtt into account
o Expected frame rate is not available. So, measured frame rate is
used as expected frame rate also. If expected frame rate were available,
the score could be reduced for lower frame rates.
- Screen share tracks: No change. This uses the very old simple loss
based thresholding for scoring. As the bit rate varies a lot based on
content and rtcscore video algorithm used for camera relies on
bits per pixel per frame, this could produce a very low value
(large width/height encoded in a small number of bits because of static content)
and hence a low score. So, the old loss based thresholding is used.
* clean up
* update rtcscore pointer
* fix tests
* log lines reformat
* WIP commit
* WIP commit
* update mute of receiver
* WIP commit
* WIP commit
* start adding tests
* take min score if quality matches
* start adding bytes based scoring
* clean up
* more clean up
* Use Fuse
* log quality drop
* Periodically report bitrate to down track.
For connection quality based on bitrate for down tracks,
the measured rate should be used. That is to ensure that
down track quality measurement does not get affected by
publisher side changes negatively (or positively).
Report the optimal bit rate to connection quality scorer
every second so that scorer has a continuously updating
picture of the stream and can compare the actual bit rate
against expected optimal bitrate more reliably.
Doing it at time like allocation, the bitrate may not be
accurate (or may not even be available). So, a periodic update
is necessary.
* add transition at allocation times
* clean up debug log
* - Use number of windows for wait to make things simpler
- track no layer expected case
- always update transition
- always call updateScore
* Make connection quality not too optimistic.
With score normalization, the quality indicator showed good
under conditions which should have normally showed some badness.
So, a few things in this PR
- Do not normalize scores
- Pick the weakest link as the representative score (moving away from
averaging)
- For down track direction, when reporting delta stats, take the number
of packets sent actually. If there are holes in the feed (upstream
packet loss), down tracks should not be penalised for that loss.
State of things in connection quality feature
- Audio uses rtcscore-go (with a change to accommodate RED codec). This
follows the E-model.
- Camera uses rtcscore-go. No change here. NOTE: THe rtscore here is
purely based on bits per pixel per frame (bpf). This has the following
existing issues (no change, these were already there)
o Does not take packet loss, jitter, rtt into account
o Expected frame rate is not available. So, measured frame rate is
used as expected frame rate also. If expected frame rate were available,
the score could be reduced for lower frame rates.
- Screen share tracks: No change. This uses the very old simple loss
based thresholding for scoring. As the bit rate varies a lot based on
content and rtcscore video algorithm used for camera relies on
bits per pixel per frame, this could produce a very low value
(large width/height encoded in a small number of bits because of static content)
and hence a low score. So, the old loss based thresholding is used.
* clean up
* update rtcscore pointer
* fix tests
* log lines reformat
* WIP commit
* WIP commit
* update mute of receiver
* WIP commit
* WIP commit
* start adding tests
* take min score if quality matches
* start adding bytes based scoring
* clean up
* more clean up
* Use Fuse
* log quality drop
* clean up debug log
* - Use number of windows for wait to make things simpler
- track no layer expected case
- always update transition
- always call updateScore
In the following order, got the wrong layer
- Max layer is 0, max published is 0, request layer is 0
- Current locks to 0.
- Max changes to 1. Nothing changes as 1 is not published yet.
- Max published changes to 1.
- As curernt layer is valid, available and locked to request layer, it
was kept. But, it should have checked if the request layer changed
and updated accordingly.
In the following scenario, PLI layer lock got stuck at the wrong layer
- target is at 2 to allow overshoot
- current gets to 1, but can't get higher because publisher is not
publishing higher layer
- max layer changed to 0
Because of adjusting for overshoot only when current == target, it never
happened and layer lock PLI kept asking for layer 0. Although, key
frames were received, switch did not happen.
Always check for overshoot adjustment possibility against current layer.
* Change lock scope of access to RTCP sender report data.
Forwarder calls back to get time stamp offset.
Holding buffer lock is a much bigger scoped lock.
Reduce lock scope and cache latest sender report under its own lock.
And use that cache when calculating time stamp offset.
* move sr cache to stream tracker manager for re-use in relay
* cache before spread
A couple of other bits
1. Use request layer for sending PLI on bind and connected.
2. When adjusting for overshoot, do not adjust target unless current is
at max. If not, it could get stuck in a lower layer in the following
scenario
a. Overshoot to layer 2
b. Max layer is 1, start sending PLI
c. Get key frame for layer 0, adjust for overshoot as we have
something at a layer lower than max.
d. Adjust for overshoot.
e. Setting target to max means that current and target are equal
and no further adjustment happens.
* Do not overshoot when layer is locked.
One more challenging case. When current layer is already locked,
should not set up for overshoot.
* set target to current
Missed this in the last commit. Sorry.
The case of
- locking to a layer
- that layer stops
- re-allocation
This should trigger a key frame request to the max available layer.
So, have to set the request layer to max available.
Addressing edge case where a layer stopped before bitrate could be
measured. Purely bit rate based change deduction missed this as
the before and after did not have bit rates.
Use available layers to look for changes, especially currently
forwarding layer going away.
Also, simplifying bits. Only in the optimal allocation path,
these things are required. When congested, bitrate is always needed.
So, for optimal path, just look at available layer changes and adjust.
Don't need to look for bitrate based layer changes. Clean up that code.
* WIP commit
* Send stream state paused only when it is paused due to bandwidth limitation.
When stream is resumed after a stream is paused, an active update is
sent. Note that this means if there are intervening events like
mute/unmute between pause and resume, resume will be sent.
* WIP commit
* fix compile
* WIP commit
* fixing tests
* clean up exempted layers
* clean up unused stuff
* correct comment
* Don't need ops queue as order is not important now
* static check
* kick off allocation when callbacks are set up, calling from receiver means callbacks may not be set up
* WIP commit
* Send stream state paused only when it is paused due to bandwidth limitation.
When stream is resumed after a stream is paused, an active update is
sent. Note that this means if there are intervening events like
mute/unmute between pause and resume, resume will be sent.
When downgrading (could be due to overshoot or opportunistically
locking to a higher layer), need to check if the max layer notification
needs to be done so that dynacast has the right max layer for the
participant corresponding to this downtrack.